Ensure the subfloor is clean, dry, and level. Acclimate the planks in the installation room for 48 hours. Lay a vapor barrier, overlapping the edges. Begin at the corner, placing spacers between the planks and wall. Use the D-Click system to connect planks, tapping gently ... Read more
Ensure the subfloor is clean, dry, and level. Acclimate the planks in the installation room for 48 hours. Lay a vapor barrier, overlapping the edges. Begin at the corner, placing spacers between the planks and wall. Use the D-Click system to connect planks, tapping gently with a rubber mallet if needed. Maintain a consistent pattern and stagger the joints. Trim the last row to fit, leaving space for expansion. Finally, remove spacers and install baseboards. Disclaimer: Installation should be done by a professional only. Improper installation may void the warranty.
Read lessEnsure the subfloor is clean, dry, and level. Acclimate the planks in the installation room for 48 hours. Lay a vapor barrier, overlapping the edges. Begin at the corner, placing spacers between the planks and wall. Use the D-Click system to connect planks, tapping gently with a rubber mallet if needed. Maintain a consistent pattern and stagger the joints. Trim the last row to fit, leaving space for expansion. Finally, remove spacers and install baseboards. Disclaimer: Installation should be done by a professional only. Improper installation may void the warranty.
Read lessMon-Fri | 8:00AM – 5:00PM |
Saturday | 10:00AM – 4:00PM |
Sunday | 11:00AM – 3:00PM |